Not every HDPE pipeline project gives you a straight run.

In Melbourne’s eastern suburbs, our crews are deep into a live installation where welded HDPE strings sometimes can’t be built in place. Instead, we’re fabricating full lengths off to the side, around the corner and up the road — then shifting them into final position using purpose-built trollies designed for tight access and minimal disruption.

📸 The image says it all:
• Urban setting
• Public transit corridor
• Live traffic management
• Precision pipe handling

It’s a great example of GEM Industrial’s practical problem-solving in action:
🔹 Crew-first planning
🔹 Custom-built equipment
🔹 Precision movement without compromising weld integrity

This is what adaptable infrastructure delivery looks like — built for the real world, not just the drawings.