Engineering the Simple Things Properly

GEM's team designed and fabricated 20 large‑bore pipe trolleys, engineered to solve a very real on‑site challenge: moving heavy pipe safely, efficiently, and without compromising material integrity.

Each trolley is built to:
• Maintain correct pipe support spacing
• Prevent ovality and surface damage
• Keep pipework elevated and protected from ground contaminants
• Improve manual handling and reduce crew fatigue
• Streamline staging and installation sequencing

A straightforward piece of kit — but engineered with purpose. When you get the small things right, the big things fall into place. Proud of the crew for continually lifting our standard of delivery.