The PT2000 made an appearance out front this week before heading straight into production, always an impressive sight.

Output for the week: 1800 mm welded spools, 1800 mm test weld and 3‑day turnaround from client request to freight rolling toward WA.

These large‑diameter spools support critical systems across gas transmission, energy infrastructure and desalination pipelines where quality, traceability and schedule discipline are non‑negotiable.

Thanks to Southern Cranes for the precision movements and pipe handling. Excellent work as always all.

 #HDPEFusion #LargeDiameterPiping #EnergyInfrastructure #GasProjects #OilAndGasAustralia #DesalinationPipelines #WaterInfrastructure #PipelineConstruction #IndustrialFabrication #ProjectDelivery #EngineeringAustralia #GEMIndustrial #HeavyWallHDPE #InfrastructureProjects #WesternAustraliaProjects